Risk Assessment
Production Title: Jahkoy - Poison
Crew Director’s: Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael  
Cinematographer’s: Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael 
Address of shoot: Hyde Park, London

Date: 11/10/16
The following potential risks / hazards might be present:
Floor space, Tripping hazards, low lighting, adverse weather / temperatures, Electrical cords and sockets, Flammable materials, Crowds Fatigue, Traffic, Animals, Scaffolding / working at height, Stunts / dangerous activities, Water
Where present, please list them below:


Risk / Hazard identified
People affected
Existing controls
Action to be taken to reduce risk or hazard
Cords
Everyone Involved (Cast and Crew)
Cable Management
Upgrade the original Cable management and keep the set as tidy as possible.
Trip Hazards
Everyone Involved (Cast and Crew)
No Existing Controls
Setup Tables and cover which will cover up the hazards so the cast don’t get injured.
Electrical Supplies
Everyone Involved (Cast and Crew)
Cover Ups and no open cords.
Make sure all electrical inputs are covered up and all safety needs are met.
Fatigue
Cast
No Existing Controls
Seats will be placed and regular refreshment breaks will be given to all cast and crew.
Damage to Expensive Hardware
Everyone Involved (Cast and Crew)
No Existing Controls
Equipment will only be used when needed and all safety needs are met.
Pedestrians and Customers
Everyone Involved (Cast, Crew and Pedestrians)
No Existing Controls
Not to go at peak times to record. Only go at times when there is few people.
Water and Spilled Fluids
Everyone Involved (Cast, Crew and Pedestrians)
Hazard Waring Cones
To no keep fluids near the equipment and clear the scence before and after recordings