Sunday, 30 October 2016
Friday, 21 October 2016
Email to Olympic Park
Today I finalised the application form to film in hyde park and sent it to the designated website to receive a reply as to whether they would forward the request to commence filming there. The plan was that this had to be sent 5 working days before the intended day of filming so we was planning to film on the 5/11/16 as this was a weekend in which we would all be available to film as it was around midday. To conclude the email I attached the letter on headed paper to prove that we were all students to bypass the need for event liability insurance as well as a site plan for the areas that we were planning to use in the filming process.
Wednesday, 19 October 2016
Third Day Of Editing (19/10/16)
Tuesday, 18 October 2016
Second Day Of Editing (18/10/16)
In this we continued editing the clips as well as got feedback from our peers as to areas we could improve upon as well as areas we done successfully. The main issue came specifically from the editing standpoint and slightly the filming as we noticed a delay in the actors timing in the video in addition the delay in the singer's voice which is to do with the syncing of his singing to that of the original audio. As a result we have got the feedback of expanding the audio and plotting key points in the actual audio and in the recorded video so that the matching of time would be seamless, In addition we also got the advice to slow down or speed up the clip so that the speed is perfectly matched to the audio. However, the praises that we received were in the actual footage that was gathered as the lighting and video quality of the video was immaculate. As a result tomorrow we are going to re-edit the clip and sync it perfectly to the track.
Monday, 17 October 2016
First Day Of Editing (17/10/16)
Today we started editing the first clips that we had recorded on Friday in the studio. This was done in the editing suite of the college using premiere pro. In this we had the first verse of the track extracted and put onto premiere pro to be further edited. From our review of all of the clips we found that the lighting of the actor was slightly dark so we added a brightness to the main actor and added a dissolve effect to merge between camera shots to create a seamless transition between footage. In this time we were also planning for our next shot on either Friday or Saturday from half term.
Ilford (17/10/16)
Today I went to the ilford exchange to see whether we would gain permission to do filming at the premises. In this I spoke to the management of the shopping centre however, we had a similar response to what we received from Westfield as they said that because of health and safety they don't permit filming in their building due to health and safety as a result we are going to have a group discussion as to whether we could find an alternative location or filming style that would allow us to compensate for the location.
Friday, 14 October 2016
First Day of filming (14/10/16)
Today we done the first part of our filming as we done the filming we needed to do in the studio. The recording time lasted from 3:00pm to 4:20pm In this time we ran through the song several times in different angles giving a range of angles and perspectives as we had the main actor sitting down, standing up and dancing to gain a range of clips. The shots that we managed was low, medium and close-up shots of him singing to the audio. The people present during the filming session was Joshua, Ashlee and the main actor.
Thursday, 13 October 2016
Location Change / Recees (13/10/16)
As a result of not being able to film at Stratford because of the new West Ham stadium we have begun to look for other alternative location that could offer a similar shot to the one that we expected to use. The one that we have looked at as an alternative is the one a t Ilford exchange as this would be a shopping centre that isn't as crowded as westfield and easy to arrange as the filming permit their is more lenient. As a result I would have to arrange a meeting to seek permission to film.
ADDRESS
High Rd, Ilford IG1 1RS
OPENING TIMES
ADDRESS
High Rd, Ilford IG1 1RS
OPENING TIMES
Monday | 9.30am – 6pm |
Tuesday | 9.30am – 6pm |
Wednesday | 9.30am – 8pm |
Thursday | 9.30am – 6pm |
Friday | 9.30am – 6pm |
Saturday | 9am – 6pm |
Sunday | 11am – 5pm |
Wednesday, 12 October 2016
Role list
This states all the sub-roles we would be having within the group as well as all the input we would have in the pre-production, filming and Editing Standpoint to divide the Tasks that we would be doing in the group. This would allow us to focus on getting tasks completed sooner and have us start filming.
Letter On Headed Paper
Thil letter on headed paper is going to be sent with the rest of the Filming and Photography Application form to request permission to film at a royal park (Hyde Park). This would be sent with the application as soon as we decide a date we can all possibly film.
Adobe Creative Suite Tutorials
This workshop was held on the 12/10/16 to provide clarity on the softwares produced by adobe creative suite (Photoshop, After effects, Premiere Pro & Illustrator.) The purpose of this workshop was to teach new skills to do in this workshop as well as a re-cap on the use of DSLR cameras. This workshop was to prepare us for the production part of our project (Editing and Filming) so all we would have the appropriate settings for filming.
Storyboard Analysis
In this we have a detailed scene by scene layout of the production as well as certain key frames and actions that would be performed at certain times. This allow us to have a organised time in which we want everything to in terms of location and actions performed by the artist but, we also have instructions for the cameraman as we also state the camera shots that would be used at that moment allowing us to have a clear structure to the production of the music video.In total we should have 40 scenes in the entirety of the video along with 3 locations being used. In this we also looked at our case studies to look at the shots we could possibly use and editing techniques we could use for the editing process.
Tuesday, 11 October 2016
Copyright Email
This is the copyright clearance we had e-mailed to Def Jam Records that are the record label that have signed Jahkoy and have ownership of the music he has produced. In this we sent them an email to request clearance to use the audio of the artist they have signed. This is to eliminate the act of copyright claiming the video and having it either taken down or have no royalties to be claimed from the video. By doing this we legally ask the label to use the audio from the artist.
Recees Review
The recees that has been produced is a detailed analysis of all the locations we are planning to uses in the video along with the opening times and whether the location would be used for narrative of for fillers in the video. In this we reviewed Westfield, Hyde Park and Studio. This was to work in correlation with the storyboard.
Constructing Recees (11/10/16)
In today's lesson we completed the Recees and Storyboard for the video production so that all our pre-production would be completed and would be able to start the filming process by Friday. In today's lesson we analysed all the locations we would be using as well as as finishing the drawing and writing of the storyboard and emailing westfield to see if they would allow filming.
Monday, 10 October 2016
Pre-plan conclusion (10/10/16)
In today's lesson we had a team talk about how we are going to finish off all of our pre-plan production In which we was gathering all of the components that we have done to ensure the planning process was complete so that we could start filming the music video. The plan was to have the planning done by this week so that we could begin filming this week. The scenes we are planning to have completed are the studio location as it is the core of part of the music video and one in which we have the closest access in using.
Risk Assessment (Westfield)
Risk Assessment
Production
Title: Jahkoy - Poison
Crew
Director’s: Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Cinematographer’s:
Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Address of
shoot: Westfield, Montfichet Rd, London E20 1EJ
Date:
11/10/16
The
following potential risks / hazards might be present:
Floor space, Tripping hazards, low
lighting, adverse weather / temperatures, Electrical cords and sockets,
Flammable materials, Crowds Fatigue, Traffic, Animals, Scaffolding / working at
height, Stunts / dangerous activities, Water
Where
present, please list them below:
Risk / Hazard identified
|
People affected
|
Existing controls
|
Action to be taken to reduce risk or
hazard
|
||
Cords
|
Everyone
Involved (Cast and Crew)
|
Cable
Management
|
Upgrade
the original Cable management and keep the set as tidy as possible.
|
||
Trip
Hazards
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Setup
Tables and cover which will cover up the hazards so the cast don’t get
injured.
|
||
Electrical
Supplies
|
Everyone
Involved (Cast and Crew)
|
Cover
Ups and no open cords.
|
Make
sure all electrical inputs are covered up and all safety needs are met.
|
||
Fatigue
|
Cast
|
No
Existing Controls
|
Seats
will be placed and regular refreshment breaks will be given to all cast and
crew.
|
||
Damage
to Expensive Hardware
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Equipment
will only be used when needed and all safety needs are met.
|
||
Pedestrians
and Customers
|
Everyone
Involved (Cast, Crew and Pedestrians)
|
No
Existing Controls
|
Not
to go at peak times to record. Only go at times when there is few people.
|
||
Water
and Spilled Fluids
|
Everyone
Involved (Cast, Crew and Pedestrians)
|
Hazard
Waring Cones
|
To
no keep fluids near the equipment and clear the scence before and after
recordings
|
||
Risk Assessment (Hyde Park)
Risk Assessment
Production
Title: Jahkoy - Poison
Crew
Director’s: Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Cinematographer’s:
Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Address of
shoot: Hyde Park, London
Date:
11/10/16
The
following potential risks / hazards might be present:
Floor space, Tripping hazards, low
lighting, adverse weather / temperatures, Electrical cords and sockets,
Flammable materials, Crowds Fatigue, Traffic, Animals, Scaffolding / working at
height, Stunts / dangerous activities, Water
Where
present, please list them below:
Risk / Hazard identified
|
People affected
|
Existing controls
|
Action to be taken to reduce risk or
hazard
|
||
Cords
|
Everyone
Involved (Cast and Crew)
|
Cable
Management
|
Upgrade
the original Cable management and keep the set as tidy as possible.
|
||
Trip
Hazards
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Setup
Tables and cover which will cover up the hazards so the cast don’t get
injured.
|
||
Electrical
Supplies
|
Everyone
Involved (Cast and Crew)
|
Cover
Ups and no open cords.
|
Make
sure all electrical inputs are covered up and all safety needs are met.
|
||
Fatigue
|
Cast
|
No
Existing Controls
|
Seats
will be placed and regular refreshment breaks will be given to all cast and
crew.
|
||
Damage
to Expensive Hardware
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Equipment
will only be used when needed and all safety needs are met.
|
||
Pedestrians
and Customers
|
Everyone
Involved (Cast, Crew and Pedestrians)
|
No
Existing Controls
|
Not
to go at peak times to record. Only go at times when there is few people.
|
||
Water
and Spilled Fluids
|
Everyone
Involved (Cast, Crew and Pedestrians)
|
Hazard
Waring Cones
|
To
no keep fluids near the equipment and clear the scence before and after
recordings
|
||
Risk Assessment (Studio)
Risk Assessment
Production
Title: Jahkoy - Poison
Crew
Director’s: Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Cinematographer’s:
Ismail Parlakbudak, Ashelle Tuitt, Joshua Michael
Address of
shoot: Studio; Leyton Sixth Form College E10 6EQ
Date:
11/10/16
The
following potential risks / hazards might be present:
Floor space, Tripping hazards, low
lighting, adverse weather / temperatures, Electrical cords and sockets,
Flammable materials, Crowds Fatigue, Traffic, Animals, Scaffolding / working at
height, Stunts / dangerous activities, Water
Where
present, please list them below:
Risk / Hazard identified
|
People affected
|
Existing controls
|
Action to be taken to reduce risk or
hazard
|
Cords
|
Everyone
Involved (Cast and Crew)
|
Cable
Management
|
Upgrade
the original Cable management and keep the set as tidy as possible.
|
Trip
Hazards
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Setup
Tables and cover which will cover up the hazards so the cast don’t get
injured.
|
Electrical
Supplies
|
Everyone
Involved (Cast and Crew)
|
Cover
Ups and no open cords.
|
Make
sure all electrical inputs are covered up and all safety needs are met.
|
Fatigue
|
Cast
|
No
Existing Controls
|
Seats
will be placed and regular refreshment breaks will be given to all cast and
crew.
|
Damage
to Expensive Hardware
|
Everyone
Involved (Cast and Crew)
|
No
Existing Controls
|
Equipment
will only be used when needed and all safety needs are met.
|
Saturday, 8 October 2016
Friday, 7 October 2016
Song Analysis (Jahkoy - Poison)
Jahkoy's song poison is a rap/R&B song about a guy professing his love to a girl and using the imagery of poison which has negative connotations of poisoning someone connoting harm in this case it is used in the ideology of influencing someone with a potion of love and him falling under a spell as connoted in lyrics like "I drank the potion, I took a shot, and it's just a motion." Verse 1 is talking about him being committed to the given relationship as he states in lines like "I'll keep it 100" and "If you believe in me, Like I believe in you" showing the signs of him committing to her. The second verse he goes on about looking back at the time they spent together as well as well as how they spent time together as stated in lines like; "Trace the steps that we take" and "We roll up and roll out" showing commitment. This is something that would have to be captured in the main storyline of the song as we have to show a relationship unfolding between the main actor an female.
Thursday, 6 October 2016
Jahkoy Poison lyrics
(Verse 1)
I need it from you
No one else will do
I’ll keep it 100
If you believe in me
Like I believe in you
Then we can make sweet loving
I’ll keep it 100
If you believe in me
Like I believe in you
Then we can make sweet loving
(Pre-Chorus)
They gon hate it cause we
making love
Like a special kind of 1 of 1
Got all these things I wanna
do to ya
And Im a make sure that I get
em done
(Chorus)
Cause you got me open
Just like a token, girl
I drank the potion
I took a shot
And it’s just the motion
I’ll take your love for what
it’s worth
Got me feeling like there’s
heaven on earth
Staring you down girl, where
you been?
The illest girl, I’ll say it
again
(Verse 2)
You tell me that you’re only
getting older
Baby I don’t wanna hold you
back
You act like I didn’t get to
know ya
Where you been, where you be
at
I know all that
Everything is on the hour
like the military
And If I want it then I got
it, I get on it like its missionary
Plus I’m looking at the right
one
And you’re all I see, just a
young visionary
Taste the love that we make
Trace the steps that we take
Work so hard for one break
Girl come lay where I lay
You know me, where I stay
We roll up and roll out
You and I the new bound
I go down, you go down
Yea, girl you know I want you
bad
(Pre-Chorus)
They gon hate it cause we
making love
Like a special kind of 1 of 1
Got all these things I wanna
do to ya
And I’m a make sure that I
get em done
(Chorus)
Cause you got me open
Just like a token, girl
I drank the potion
I took a shot
And it’s just the motion
I’ll take your love for what
it’s worth
Got me feeling like there’s
heaven on earth
Staring you down girl, where
you been?
The illest girl, I’ll say it
again
(Bridge)
Wanna hit that spot and make
it feel right baby
Wanna get you hot then put
you on ice baby
(Chorus)
Cause you got me open
Just like a token, girl
I drank the potion
I took a shot
And it’s just the motion
I’ll take your love for what
it’s worth
Got me feeling like there’s
heaven on earth
Staring you down girl, where
you been?
The illest girl, I’ll say it
again
New Song Choice (Audio) (6/10/16)
The new song that we have decided to use is Jakhoy's Poison as a replacement for Jay Silva's "No Way" A this show has the same type of lyrical and video concept so we would be able to use the same video concept for the video however, we would have to change the song that the video it would be based around.a relationship of a male artist and female with him looking back and reminiscing on their first interaction.
Subscribe to:
Posts (Atom)